INTEGRAL, I.E., WHITE TANK WATERPROOFING SOLUTION
References
Regati pst 3/4, 3/5, 3/6, 3/7, Pirita, Tallinn, Regati houses (I stage)
- 1 floor underground
Liven AS
- Concrete volume 3000 m³
- WPM® Metal Sheet Waterstop 80R / 125R / 125L
- WPM® Crack Inducing Waterstops
- WPM® Formwork Waterstops
Sadama St. 4, ANKUR
Hyatt Hotel Ja Office Building
- 1 floor underground
AS Merko Ehitus Eesti
- Concrete volume 1200 m³
- WPM® Crack Inducing Waterstop
- WPM® Metal Sheet Waterstop
- WPM® Formwork Waterstop
- Kraso and Doyma pipe penetration system
Paldiski mnt 120, Pikaliiva Kaarmaja, apartment buildings
- 1 floor underground
Bonava Eesti OÜ
- Concrete volume 3400 m³
- WPM® Metal Sheet Waterstop 125L
- WPM® Metal Sheet Waterstop 125R
- WPM® Formwork Waterstop
- WPM® Crack Inducing Waterstops
An overview of 4 projects where we used the integral, i.e., white tank waterproofing solution.
The video shows how all the materials are installed in the Pikaliiva Kaarmaja, Sõpruse pst, and Paekalda projects.
Paekalda, apartment buildings
Semi-open parking deck
AS Merko Ehitus Eesti
- Concrete volume 3000 m³
- WPM® Metal Sheet Waterstop 125R
- WPM® Crack Inducing Waterstops
READ CUSTOMER STORY
Kiikri st. 6, apartment building
Maru Betoonitööd
A complete underground parking lot was built using 1000+ m of various WPM® waterproofing waterstops in combination with 2000 m³ of concrete with crystalline admixture.
Marijas st. 2, office
Novira Capital SIA
The office building with two underground parking floors in the center of Riga, with a construction area of 5000 m², was waterproofed using Primostar’s White Tank method.
Kiikri st. 6,
apartment building
Kiikri Ehitus OÜ
- Concrete volume 2010 m³
- WPM® Metal Sheet Waterstop
- WPM® Formwork Waterstop
- WPM® Crack Inducing Waterstop
- PVC Waterstop
- Injection Hose
- Kraso and Doyma pipe penetration system
Päevalille st. 6,
apartment building
Nordecon Betoon OÜ
- Concrete volume 974 m³
- Clay-based waterstops
LATVIA & LITHUANIA
Hanzas st. 3B Riga, office and apartment building
SIA Hanzas 3B
- Concrete volume
- WPM® Metal Sheet Waterstop
- WPM® Formwork Waterstop
- WPM® Crack Inducing Waterstop
- PVC Waterstop
Marijas st. 2a Riga, office building
Novira Capital SIA
- Concrete volume 3800 m³
- WPM® Metal Sheet Waterstop
- WPM® Formwork Waterstop
- WPM® Crack Inducing Waterstop
- Self-expanding waterstop
- Injection Hose
Terbetas st. 72 Riga,
apartment building
YIT Latvija SIA
- Concrete volume 1229 m³ b
- WPM® Metal Sheet Waterstop
- WPM® Formwork Waterstop
- WPM® Crack Inducing Waterstop
- Self-expanding waterstop
- Injection Hose
Rüpniecibas st. 27 Riga,
apartment building
Merks SIA
- Concrete volume 2540 m³
- WPM® Metal Sheet Waterstop
- WPM® Formwork Waterstop
- WPM® Crack Inducing Waterstop
- Self-expanding waterstop
- Kraso sealing element system
Žagatu st. 7 Riga,
apartment building
YIT Latvija SIA
- Concrete volume 415 m³
- WPM® Formwork Waterstop
Radvilenu 1c, The Main Office of The Kaunas Police Department
Merko Statyba UAB
- Used Primostar White Tank solution.