For preparing a defined breaking point, the WPM CRACK INDUCER is used in cast-in-place concrete between the reinforcement steel in the wall and the slab.
PACKAGING
Box: 6 x 2.5 m main element, 12 x Z-part, connection clips, adhesive tube, metal screws
WORKING TEMPERATURE
from -35°C to +75°C
STORAGE PERIOD
36 months (in dry original packaging in a cool place)